top of page
ELIRE logo series-2.png

Marine Cabins

Defence-ready floating accomodation, engineered for rapid deployment.

ChatGPT Image Aug 15, 2026, 10_09_59 PM - Copy.png

Lower risk. Faster  to deploy. Operationally adaptable.

01

200+ bed capacity

Flexible layouts temporary or semi-permanent workforce accomodation.

02

modular systems

Built on repeatable 400 sqm and 800 sqm floating platform systems.

03

one or two decks

Configurable single- or double-deck accommodation arrangement.

04

rapid deployment

Installed waterside with lower disruption than permanent buildings r floatels.

05

Expandable and reconfigurable

cale, relocate, or adapt the system as operational demand changes.

06

Defence waterfront solution

Designed for constrained naval and industrial waterfront environments.

Capability and Cabin Experience

Designed for personnel readiness, operational resilience, and compliant accomodation.

kling_20260521_IMAGE_Image1Use__5080_1.png
kling_20260511_IMAGE_Restyle_th_5410_1.png
kling_20260511_IMAGE_Restyle_th_5410_1.png
kling_20260521_IMAGE_Image1Use__5080_1.png
kling_20260521_IMAGE_Image1Use__5077_1.png

Twin En-Suite Cabins

Two-person cabins with wet module, wardrobes, desk, under-bed storage, and central window.

Compliance-led layouts

Concepts developed against NORSOK accommodation requierments and UK Merchant Shipping crew accommodation regulations.

Circulation & Escape

External perimeter walkways and distributed stair cores support emergency eggress and routing redundancy.

Technical Flexibility

Surplus capacity can be repurposed for HVAC, electrical, piping, stores, and plant spaces.

b-15 Fire Assumptions

Indicative cabin linings include insulation and structural fire protection assumptions for further design development

Grid-independent energy ready

Can integrate ELIRE Energy-to-Power solutions for resilient off-grid waterfront operations.

Redeployable asset

Repeatable, removable and reusable infrastructure that reduces stranded asset risk.

a6167b_b75edd9263894eac8f1e1cb60a8b7515~mv2.avif
ChatGPT Image Aug 15, 2026, 09_44_52 PM.png

Accommodation, infrastructure, and energy integrated into one deployable maritime system.

bottom of page